Keywords
Gemini 11 in preflight maintenance e-gem11-10010
← Collection

images

Gemini 11 in preflight maintenance

by
Nasa/Novapix
Reference
e-gem11-10010
Date
2007-11-12

The Gemini 11 spacecraft is lowered onto a dolly for preflight maintenance before stacking on the Titan rocket at the Kennedy Space Center. Dick Gordon and Pete Conrad would liftoff in this spacecraft on September 12, 1966 for a mission lasting almost three days. The crew practiced docking with the Agena unmanned docking craft, and Gordon also performed two spacewalks during the mission.

Contact →